Public Notice: Ridgevalley – Sewer Lift Station and Manhole Maintenance
Starting on Tuesday, October 10, 2023, Contractors will commence work on relining the Sewer Lift Station and Manholes within the Hamlet of Ridgevalley. Contractors will be accessing all manholes in the community.
The construction work is expected to be completed by Tuesday, October 31, 2023. Work hours are scheduled from 7:30 a.m. to 8:00 p.m., including weekends. These extended hours aim to minimize disruption and expedite the project’s completion.
Please be aware that unforeseen circumstances or extreme weather conditions may require an extension of the project timeline, potentially until Thursday, November 30, 2023.
We appreciate your patience and cooperation during this time. These improvements are designed to enhance the reliability and longevity of our sewer system, ensuring a more sustainable and resilient future for Ridgevalley.
If you have any questions or concerns, please feel free to reach out to the Enviromental Service Department at 780.524.7600.
Why Lift Station and Manhole Relining Matters:
Lift Station and Manhole relining are vital components of maintaining our wastewater system. It plays a crucial role in:
- Ensuring Longevity: By reinforcing the structural integrity of manholes, we extend their lifespan, reducing the need for costly replacements.
- Reducing infiltration: Relining helps seal any cracks or leaks, preventing unwanted infiltration of groundwater and ensuring the system operates efficiently, preventing sewer backups for residents.
- Environmental stewardship: Preventative maintenance goes a long way to extending the life span of the sewer system as a whole; wastewater systems are costly to design and expand.