Greenview Operations will be loading and hauling snow from the south side of the Ridgevalley Arena, TWP RD 713 east of RR 262, starting January 16, 2025, and ending January 17, 2025, from 8:00 am – 5:00 pm on both days.

The westbound lane will be used for loading trucks, and signage will be set up from both directions. The haul route will start at the arena, go west on TWP RD 713 to Harper Creek Road, and proceed to the dump site at the DeBolt transfer station.

We kindly ask everyone to:

  • Use caution when travelling through the area
  • Obey all posted construction signs

Thank you for your patience and cooperation!