
Geotechnical drilling will be conducted in the Ridgevalley area (south on Range Road 262 and west on Township Road 705) beginning Thursdsay, June 18, 2026.
Please be aware that traffic will be reduced to single-lane access for a short period. Please drive with caution and follow posted signage.
