Spring Flooding Update #16

We have three roads which have reopened today: in the Sunset House area Township Road 710 east and west of Range Road 202 are open; Township Road 734 east of Hwy 736 in DeBolt area is being repaired and should also be open today. Updates will continue to be provided periodically through our website and social media networks as new roads reopen.

Many surface hazards have been addressed and are being repaired. It is anticipated that most road repairs will be completed in one to two weeks. A few areas have sustained serious damages and will remain marked as hazards with signage so that drivers are aware. Long term repairs for these areas will be scheduled throughout the 2018 construction season.

New sinkholes have started to appear now that the flood waters have subsided and the ground settles. There is a new washout in the Sweathouse area at Range Road 195 a half mile south of Township Road 710. To report areas of concern, call Operations at 780-524-7602 or contact the area supervisor for your region: Ron Pollack at 780-524-7607 for Valleyview, Sunset House, Sweathouse, New Fish Creek, Ridgevalley, and Little Smoky; or Robert Kazakawich at 780-524-6086 for DeBolt, Puskwaskau, Grovedale and Grande Cache.

Below are the statistics as of May 10th:

  • New Fish Creek Area: 4 hazards, 0 closed roads.
  • Valleyview North: 0 hazards.
  • Valleyview South: 3 hazards, 0 roads closed.
  • Sunset House and Sweathouse Area: 2 hazards, 0 closed roads.
  • Little Smoky Area: 0 hazards, 1 closed road.
  • Ridgevalley Area: 0 hazards.
  • Crooked Creek: 0 hazards.
  • Puskwaskau: 10 hazards and 2 closed roads.
  • DeBolt: 9 hazards, 7 closed roads.
  • Grovedale: 9 hazards, 0 closed roads.

Total: Today there are 37 hazards and 10. On Tuesday there were 34 hazards and 16 closures.